Site

Brown Lake

  • Site Canada
  • Energy Hydroelectricity
  • Client BC Hydro
  • Status In operation
  • Put into operation 1996
  • Acquired 2012
  • PPA expiry 2043
  • Gross installed capacity 7.2
  • Participation Innergex (%) 100