Site

Les Renardières

  • Location France
  • Energy Wind Energy
  • Client Électricité de France (EDF)
  • Status In operation
  • Commissioned 2017
  • Acquired 2017
  • PPA expiry 2032
  • Gross installed capacity 21
  • Participation Innergex (%) 70
  • Partnership Crédit Agricole Assurances & Crédit Agricole Centre-est

The Renardières Wind Farm is located in the Grand Est region, in the municipalities of Allibaudières and Champigny-sur-Aube, in the Aube department (10).

The wind farm consists of 7 wind turbines, with a total capacity of 21 MW. Its average annual output is 43,600 MWh of renewable electricity, equivalent to the annual electricity consumption of approximately 9,300 French households.

See also : Renardières Sud