Project

Four Winds Energy

  • Location Canada
  • Energy Wind Energy
  • Client BC Hydro
  • Status Development
  • Commissioned 2030
  • PPA expiry 2060
  • Gross installed capacity 200
  • Participation Innergex (%) 49
  • Partnership West Moberly First Nations

The Four Winds Energy Project, formerly known as Stewart Creek, is a proposed renewable energy project located southwest of Fort St. John in northeast British Columbia, developed through a partnership between West Moberly First Nations and Innergex Renewable Energy Inc.

The project was awarded an Energy Purchase Agreement by BC Hydro through its 2024 Call for Power. Designed to generate clean, reliable electricity while respecting the land and community values, the project is targeting up to 200 MW which is enough energy to power approximately 35,000 homes in BC annually.

The proposed development would include approximately 35 wind turbines, along with supporting infrastructure such as collector lines, an electrical substation, maintenance facilities, access roads, and other temporary works such as quarries and laydown areas. The Four Winds Energy Project is strategically located in an area with existing resource road networks, a strong wind resource and existing transmission capacity, allowing it to efficiently connect to the provincial grid while minimizing new infrastructure. Subject to approvals and continued collaboration, construction is scheduled to begin in late 2028, with commercial operations targeted by 2030 and an operating EPA term of 30 years.

Sustainable development is central to the project’s approach, supported by ongoing engagement and extensive environmental and technical work—including wildlife, vegetation, birds and bats, aquatic habitat, archaeological, geotechnical, and noise/visual studies—to inform project design and help ensure potential effects are carefully understood and addressed. Through partnership, careful planning, and open dialogue, the Four Winds Energy Project aims to deliver clean energy while creating shared benefits for the community, supporting reconciliation, and contributing to a more sustainable energy future for British Columbia; as work progresses, studies and field programs continue to guide responsible siting and design. Input from Indigenous and local communities will help shape how the project is planned, built, and operated.

Upcoming Events

Environmental Technical Sessions – Open House

Learn more about the field studies that have been done for the project, meet the team and ask any questions you may have.

  • Fort St. John - November 24, 2026

    Whole Wheat and Honey Café
    10003 100 Street
    Fort St. John
    4:00 – 7:00pm

  • Dawson Creek - November 25, 2026
    Kiwanis Performing Arts Centre (KPAC)
    10401 - 10th Street, Dawson Creek, BC
    4:00 – 7:00pm
  • Groundbirch – November 26, 2026

    McLeod Community Hall
    8025 Rd 265
    Groundbirch, BC

    4:00 – 7:00pm

We will have refreshments available and everyone is welcome.

Other information
  • 35km Southwest of Fort St. John
  • Up to 32 turbines, each ~6.5 MW
  • Targeting up to 200 MW
  • Construction to begin late 2028
  • Operations to begin in 2030
  • 30 year operating EPA term
Four Winds Energy Map

The design drawing displayed here (V23) includes the assessment of alternative wind turbine locations to account for potential site features that may need to be avoided, pending the results of the various studies, technical assessments and community engagement underway for the project. The project would include up to 35 utility scale wind turbine generators, collector lines, a substation, operations and maintenance facility, site access roads, long-term meteorological towers, and temporary construction and laydown areas. Respecting archaeological, cultural, and environmental features of a site we develop is a priority. Studies and analyses will be conducted on the conceptual project layout to gain a thorough understanding of the features on the site. The intent would be to arrive at the best possible final layout, that balances these aspects along with technical and community considerations.

Respect for the land and its long history of use is central to the Four Winds Energy Project. Extensive environmental, archaeological, technical, and socio-economic studies are underway to inform project design and ensure potential effects are carefully understood and addressed. These studies include wildlife, vegetation, birds and bats, aquatic habitats, terrain and soils, wind resources, and archaeology, with Indigenous Knowledge and participation playing a key role throughout the process. We welcome your feedback and comments on the studies as they become available.

The Four Winds Energy Project is expected to create meaningful employment opportunities during both construction and long-term operations.

The project is anticipated to support approximately 250-350 construction-related jobs, providing work across a range of skilled trades and services. Certain jobs are expected to be available directly through the Construction Prime Contractor, others through subcontracting opportunities.

Once operational, the project would create ~5-10 permanent, full-time positions as well as other contracting opportunities to support ongoing operations and maintenance.

In addition, the project is expected to generate indirect employment opportunities through services such as road maintenance, vegetation management, and other local support activities, helping to contribute to lasting economic benefits in the region.

Learn more about employment and contracting opportunities here.

Interested in working on the Four Winds Energy Project? Complete the Expression of Interest form here and send it to fourwindsenergy@innergex.com

Questions or comments?

Project Email: fourwindsenergy@innergex.com

Project Contact: 

Lisa Clement
Advisor - Indigenous and Community Relations
Email: lclement@innergex.com
Or call: 778-789-2249