If natural flows are less than navigational flows, then no water will be diverted by the hydro project and all natural flows diverted will be available to the diversion reach.
Attention: You must notify Innergex at least 48 hours prior to any of the dates indicated below to confirm that you will utilize navigational flows using the preferred flow release submission.
200m upstream of tailrace
7.73
Measure time 2024-11-10 11:01:13
100m downstream of intake
0.79
Measure time 2024-11-10 11:01:13