Sitio

Portneuf-1

  • Ubicación Canadá
  • Energía Hidroelectricidad
  • Cliente Hydro-Québec
  • Estado In operation
  • Puesta en servicio 1996
  • Vencimiento de PPA 2046
  • Potencia bruta instalada 8
  • Participación Innergex (%) 100

The Portneuf-1 (PN-1) facility is located 4 km upstream from the mouth of the river at Quatre Milles Falls. The powerhouse was built on the east bank and holds two horizontal, double-regulated S-type Kaplan turbines. 

The Portneuf Facilities consist of three run-of-the-river hydroelectric power generating stations. They are located on the Portneuf River in Portneuf-sur-Mer within the Seigneurie des Mille-Vaches. The Portneuf River has an effective drainage area of 3,110 square kilometres and originates from Portneuf Lake. Portneuf-sur-Mer is located 300 km east of Québec City.