Back to sites

Walden North

EnergyHydroelectricity
StatusIn operation
Commissioned1992
Acquisition2016
PPA expiration-
Innergex participation (%)51.0
Capacity - gross (MW)16
Capacity - net (MW)8.2
ClientBC Hydro
PartnerCayoose Creek Development Corp.

Project

The Walden North Hydroelectric project is a 16 MW facility located on private land in Cayoosh Creek near Lillooet, in British Columbia. It is a run-of-river hydro plant diverting flow from the Cayoosh Creek through a 250 m power tunnel and 100 m penstock, to five Litostroj horizontal Francis turbines. The facility was commissioned and has been in operation since 1992.

Partnership

Innergex and Cayoose Creek Development Corp., the economic arm of the¬†Sekw’el’was Cayoose Creek Band, have formed a limited partnership to jointly acquire the assets of the Walden North project.