Boulder Creek

EnergyHydroelectricity
StatusIn operation
Commissioned2017
PPA expiration2056
Innergex participation (%)100
Capacity - gross (MW)25.3
Capacity - net (MW)25.3
ClientBC Hydro

Project

Boulder Creek is a 25.3 MW run-of-river hydroelectric project. It is part of the broader Upper Lillooet Hydro Project.

This hydroelectric facility diverts partial flows from the river, through an intake structure directly into a tunnel and/or penstock to the turbines and generating equipment. The water is then be returned to the river.

Electricity generated is transmitted by a 230 kV transmission line that connects the two hydroelectric facilities (Boulder Creek and Upper Lillooet) to the BC Hydro transmission system.

ECOLOGO_RGB_Green

 

PRODUCT CERTIFIED FOR REDUCED ENVIRONMENTAL IMPACT. VIEW SPECIFIC ATTRIBUTES EVALUATED: UL.COM/EL
CCD 003