Technical data

The Montmagny Facility obtains water from the Du Sud River, which has a drainage area of approximately 1,927 square kilometres.

This Facility consists of a run-of-the-river hydroelectric power generating facility with an installed capacity of 2.1 MW. The powerhouse holds five single-regulated Kaplan-type turbines. The power generated is transmitted to Hydro-Québec's grid through a short overhead line. The expected annual production of electricity of the Montmagny Facility is 7.211 GW-hr.

Location

Montmagny

Gross head (m)

9

Number of turbines

5

Type of turbine

Kaplan

Installed capacity (Megawatt)

2.1

Acquisition date

December 2000

Commissioning

May 23, 1996

Electricity purchaser

Hydro-Québec

Expiry of Power Purchase Agreement (PPA)

2021

Innergex Power Income Fund announces its distribution for November 2008

Innergex Power Income Fund : Strong revenue increase for third quarter 2008

Innergex Power Income Fund announces its distribution for October 2008

OUR LATEST QUARTERLY REPORT

© Innergex 2004

Legal notice