The Chaudière Facility obtains its water from the Chaudière River, which has an upstream drainage area of approximately 6,605 square kilometres and comprises the Megantic Lake and the Beaurivage River.

The Chaudière Facility consists of a run-of-the-river hydroelectric power generating station with a total installed capacity of 24MW that holds two horizontal double regulated Kaplan-type turbines. The plant is fully automated and may be operated locally or remotely. The power generated is transmitted to the grid of Hydro-Québec through a 200-meter overhead line. The Facility's expected annual production of electricity is 116,651 MW-hr.

Location

Lévis (south shore of Québec City)

Gross head (m)

35

Number of turbines

2

Type of turbine

S-type Kaplan upstream

Installed capacity (Megawatt)

24.0

Start of construction

March 12, 1998

Commissioning

March 14, 1999

Electricity purchaser

Hydro-Québec

Expiry of Power Purchase Agreement (PPA)

2019

Innergex Power Income Fund announces its distribution for November 2008

Innergex Power Income Fund : Strong revenue increase for third quarter 2008

Innergex Power Income Fund announces its distribution for October 2008

OUR LATEST QUARTERLY REPORT

© Innergex 2004

Legal notice